Church of Seven Dolors
2/2/2007
Size: 18,200 square feet
Location: Albany, MN
Description:
• Weidner's provided and installed a complete new HVAC system.
• Consists of a geothermal well utilizing ground water to heat and cool the church.
• Water to water heat pumps provide heating and cooling water to fan coils and air handlers that serve the entire church.
• Back up gas fired boiler system was also installed.
• This system provides substantial energy cost savings to the church.

Commercial developers and homeowners in Central Minnesota turn to Weidner's for the company's proven approach, which includes:
- Cost-effective, energy-efficient installations and upgrades
- Expertise in Design/Build and conventional designs
- Conventional Plan and Spec
- Upgrades
- Retrofits
- Attentive, affordable 24-hour service
- Residential installation and service
All focused on saving
customers' time and money.


